October 7, 2026

Callonwood Residents,

With ongoing fiber digging and noted infrastructure line incidents, everyone is understandably concerned. Correspondence was sent on September 18 noting Kinetic work beginning in the neighborhood. This was also posted at callonwood.com.

Questions have been raised as to the distance of the rights-of-way and utility easements. This can vary by house & particular street. Check your original survey or deed. Town/County right of ways vary. It has been noted that rights-of-ways are typically 25’ from the middle of the street for Indian Trail & typically 30’ from the middle of the street for Stallings. All should be validated by your documents. In addition, Kinetic has an original agreement with the developer of the neighborhood. The documents are on the FirstService website. In the document it notes, “Right-of-way to include 15 feet behind curbing and/or sidewalks and 5 feet each side of common lot lines.”  Recently Kinetic noted, “In this instance, the easement is granted where our current facilities are located. This is confirmed in the covenants and restrictions. However, anywhere we do not have facilities we will adhere to the public right of way, according to union county records, or Stallings/Indian Trail records.”

A particularly serious incident involved a house fire in the area where AT&T work had occurred. An electrical line was noted as having been cut, although we are still awaiting the official report and are not making any determination as to the cause of the fire. It has also been determined that AT&T did not have the proper encroachment permits for the work, and neither the Town of Stallings nor the HOA was aware of the work until the incident occurred. AT&T has now been directed to submit required encroachment requests to both the Town of Stallings & Town of Indian Trail.

Given the seriousness of the incident, along with other utility strikes and service interruptions, the HOA continues to raise concerns with the Towns regarding permitting, utility locating, safety protocols, restoration, and what additional safeguards may be appropriate before further work proceeds.

Significant communication and concerns are being documented and shared with the Towns and the current fiber company, Kinetic.

Both the Town of Stallings and the Town of Indian Trail have been very involved and proactive in working to mitigate concerns and improve coordination as this work continues. We greatly appreciate the time and effort our Town officials and staff have expended on behalf of Callonwood. The Towns are required to process and issue applicable permits within the legal and regulatory framework that governs this work. Resident reporting and documentation are therefore important in helping the Towns identify patterns, follow up on concerns, and determine what additional measures may be available within their authority.

Among the items requested or discussed are the following. Some information has already been provided, while other items remain difficult to determine precisely.

  • Clear advance notice to residents, including required door hangers with appropriate contact information.
  • Identification of the provider, contractor, and primary onsite contacts.
  • The best available construction schedule and anticipated street sequence, recognizing that exact timing and the next street may change as work progresses. (We have been told this is difficult to provide as the construction process is unfolding.)
  • Clear procedures for utility strikes, suspected gas leaks, electrical issues, and other safety concerns.
  • Confirmation that crews stop work when utility markings are missing, incomplete, or questionable until the area can be properly verified.
  • Proper restoration of lawns and disturbed areas, including leveling, raking, topsoil where needed, seeding, and follow-up after crews leave.
  • Better tracking and reporting of service cuts, utility damage, open holes, and other unsafe conditions.
  • Review by the Towns of what additional safeguards can be required when repeated utility strikes or locate concerns are occurring.

For Kinetic-related construction, restoration, or damage concerns, residents may contact Scott Ward with Globe Communications at 704-690-1530 or scott.ward@globeinc.com.

Residents who experience a utility outage, gas concern, electrical issue, or other immediate hazard should contact 911 and the affected utility provider first. For other construction or restoration concerns, please document the location and take photos when possible. Please also send or copy president@callonwood.com with all relevant information so the HOA can help document issues occurring within the community. Notify the relevant Town. We appreciate residents who are engaged in the community to help in gathering and sharing information as appropriate.

We will continue to share updates as information becomes available.

Thank you,
Callonwood HOA Board